Short answer
Validation proves, before you rely on it, that your cleaning procedure actually removes the allergen from that equipment to an acceptable level. Verification is the ongoing check that each clean was done the way you validated it. You validate once per procedure and equipment (and again after changes). You verify every changeover.
Validation: what it looks like
- Pick the worst case: the hardest-to-clean product (sticky, high-protein, powder), the hardest equipment, and the longest run.
- Clean using the written procedure exactly.
- Test with allergen-specific methods, such as ELISA or lateral-flow swabs for the protein, and rinse-water or first-product-off tests.
- Repeat at least three times with passing results, and record the method, sampling points and detection limits.
- Revalidate when you change products, equipment, chemicals or the procedure.
Verification: what it looks like
- Visual inspection against a checklist after every allergen changeover
- Periodic allergen-specific swabs at high-risk points
- ATP or protein swabs as a quick general-cleanliness check, noting that ATP doesn't detect allergens specifically
- Sign-off by a trained person before the next production run
Common mistakes
- Using ATP results as allergen validation.
- Validating with an easy product and running a harder one.
- No revalidation after a new line or recipe.
